Scheduled meeting held on 6/10/2009 at 14:30 hours in Postal Directorate in the chamber of Shir A.K Sharma DDG (esst) Shri T.N Rahate President FNPO and General Secretary NUPE P-IV alongwith Shri D.Theagarajan Secretary General FNPO & General Secretary NUPE R-III, D.Kishan Rao General Secretary NUPE Group ’C’ and Shri Abdul Hameed Siddigi G/S NUPE R-IV took part in the said meeting.
Discussion held on the charter of demand of JCA (Postal) of dt 15/2/2008 on action taken report.
Item I: Refixation of wages of all Part time & full time casual Labour/Contingent: - File moved to Joint Secretary Finance and after approval from DOPT orders will be issued. In case of Temp Status casual Labour Gr ‘D’ orders are issued for refixation wef. 1.1.2006.
Item II : Stop curtailment of deliveries and introduction of single delivery system:- DDG (Estt) clarified that no any instructions or orders are issued from Postal directorate However he asked the deligation to meet DDG (mm) for further clarification.
Item III - Revision of norms for Postman and including work load of speed post with proper work norms: - cycle beat & foot beat. Time factor will be encreased. Time factor of delivery of reqd article will be given for speed post article.
Item IV- Postman double duty (Beat) allowance to be enhanced – allowance will be enhanced positively.
Item V - To fill up vacant post of Postman and Gr ’D’ : - discussed in detail and DDG (Staff) will do the needful.
Item VI - Enhance financial powers of SPOs & SSPOs to sanction NHA to Mail Overseer: - Mail overseer Night halt allowance sanction limit will be encreased.
Item VII :- cast validity The Staff side pointed that the cases of cast certificate in S/C & ST are pending with committee and in some cases committee rejected the certificate on the place that state Govt has now dilated these cast from the Schedule of S/C & ST.
In this matter the cast certificate issued from Govt authorities should be taken into account and now those staff should not be removed from the deptt.
The meeting ended with Vote of Thanks
T.N Rahate
Discussion held on the charter of demand of JCA (Postal) of dt 15/2/2008 on action taken report.
Item I: Refixation of wages of all Part time & full time casual Labour/Contingent: - File moved to Joint Secretary Finance and after approval from DOPT orders will be issued. In case of Temp Status casual Labour Gr ‘D’ orders are issued for refixation wef. 1.1.2006.
Item II : Stop curtailment of deliveries and introduction of single delivery system:- DDG (Estt) clarified that no any instructions or orders are issued from Postal directorate However he asked the deligation to meet DDG (mm) for further clarification.
Item III - Revision of norms for Postman and including work load of speed post with proper work norms: - cycle beat & foot beat. Time factor will be encreased. Time factor of delivery of reqd article will be given for speed post article.
Item IV- Postman double duty (Beat) allowance to be enhanced – allowance will be enhanced positively.
Item V - To fill up vacant post of Postman and Gr ’D’ : - discussed in detail and DDG (Staff) will do the needful.
Item VI - Enhance financial powers of SPOs & SSPOs to sanction NHA to Mail Overseer: - Mail overseer Night halt allowance sanction limit will be encreased.
Item VII :- cast validity The Staff side pointed that the cases of cast certificate in S/C & ST are pending with committee and in some cases committee rejected the certificate on the place that state Govt has now dilated these cast from the Schedule of S/C & ST.
In this matter the cast certificate issued from Govt authorities should be taken into account and now those staff should not be removed from the deptt.
The meeting ended with Vote of Thanks
T.N Rahate
President FNPO &
General Secratry